网曝黑料猛料吃瓜网_国产产无码乱码精品久久鸭_久久99青青精品免费观看_在线看片免费人成视频大全_交换朋友夫妻客厅互换_亚洲性色av一区二区三区_97无码免费人妻超级碰碰碰碰_成人毛片18女人毛片免费看_久久久无码av精品亚洲a片软件

Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

Aluminum alloy sacrificial anode

magnesium anode, zinc anode

Telephone:

0391-7588881 +8618739187123

Jiaozuo Libo Light Alloy Co., Ltd.

Q & A

Why are pile foundation test piles designed differently from ordinary piles

  • Author:Libo
  • Source:wwww.95589558.com
  • Date:2021-06-11
  • Click:0

If the reinforcement is different. Considering that the test pile should bear much more force than ordinary engineering pile (generally more than twice), in order to avoid the failure of the test due to the strength of the pile itself in the test process, the pile body is strengthened.

Online
聯(lián)系方式

熱線電話

18739187123

上班時(shí)間

周一到周五

公司電話

0391-7588881